HMS on site
Engineering.
On the ground.
Projects & plant care
A closer look at a completed installation and the equipment behind daily water and wastewater operations.
Completed project
MBBR sewage
treatment plant.
Engineering, fabrication, installation, testing and commissioning brought together in one completed treatment installation.
- Technology
- Moving bed biofilm reactor
- Scope
- Engineering through commissioning
- Status
- Successfully completed

01 / Fabrication
The structure takes shape.
The treatment structure before equipment and service connections are integrated.

02 / Completed installation
A connected treatment system.
Process equipment, pumping, filtration and pipework installed as one system.
From stages to system
Coordinated through delivery.
The two photographs show the same plant at different stages. The delivery scope links fabrication with equipment installation, testing and operational readiness.
Explore the delivery processOperation & maintenance
Attention to the assets that matter.
A closer look at the equipment and monitoring behind everyday plant operation.

Filtration equipment
Pressure sand and activated carbon vessels with connected process pipework.

Electrical control
MCC and PCC panels supporting equipment control and plant operation.

Pumping equipment
Installed pumps, valves and pipework, with access for inspection and servicing.

Process monitoring
A wastewater sample in a graduated cylinder for observation of settling condition.
Your next installation
Let’s talk about the work ahead.
Discuss the treatment requirement, existing plant condition or maintenance scope with HMS.
Contact HMS