HMS Environmental Engineering Pvt. Ltd.info@hmseng.com

05 / Automation & plant upgrades

Better visibility. More controlled operation.

Control systems, equipment rehabilitation and targeted plant modifications for changing operational requirements.

Plant control panel with a process display and equipment control switches
Instrumentation / plant control

Controls · Rehabilitation · Modernization

Understand the limitation before changing the plant.

Recurring faults, limited control visibility or changed demand can indicate a need for more than routine servicing. HMS assesses the process, equipment and control interfaces to develop a focused modernization scope.

Technical scope

Upgrade the right part of the system.

01

Electrical infrastructure

Coordinate panel and distribution requirements with the equipment being controlled.

  • Motor control centre (MCC) panels
  • Power control centre (PCC) panels
  • Electrical distribution systems
02

Automation & instrumentation

Connect process information with the control actions needed at plant level.

  • Programmable logic controllers (PLC)
  • Supervisory control and data acquisition (SCADA)
  • Instrumentation and control systems
  • Process automation
03

Plant rehabilitation

Address identified equipment or process limitations within the existing installation.

  • Technical system assessments
  • Equipment restoration and replacement
  • Process and utility pipework modifications
  • Operational improvement scopes

Our approach

A defined change, verified in operation.

01

Diagnose the constraint

Review fault history, process symptoms, condition and changes in demand.

02

Define control and equipment changes

Identify the required signals, operating sequences, hardware and rehabilitation work.

03

Plan the changeover

Agree interfaces, shutdown arrangements and a practical installation sequence.

04

Test and return to service

Verify the modified functions and support the transition into the revised operating routine.

Recurring equipment failuresLimited process visibilityChanging flow or operating demand

An informed starting point

Identify what needs to change.

  • Fault history and current operating limitations
  • Panel information and available control drawings
  • Shutdown constraints and required operating changes

Fault records, control drawings and operating constraints help focus the assessment on the functions that need improvement.

Connected expertise

Turnkey engineering

Automation & plant upgrades

Give the operating problem a closer look.

Bring the recurring fault or control limitation to HMS so the assessment can focus on the equipment and functions involved.

Review an upgrade